Survey for Hydrological Study of The River Yar - IOW
Case study

Survey for Hydrological Study of The River Yar - IOW

Hydrological study to help inform a solution to flooding management in an area of outstanding natural beauty and scientific interest.

Transport Planning
Infrastructure Design
Environmental Assessment

Details

Enhancing and Managing the Natural Beauty of the Site

Mayer Brown was commissioned by Atkins, on behalf of the Environment Agency to assist in the hydrological study of the River Yar to assist in managing the flood plain area and to establish the most cost effective solution to enhance drainage and manage an area of outstanding natural beauty and special scientific interest.

Surveying the Data

Mayer Brown was requested to provide survey data of the River to construct river sections and gain height information of various sluices, culverts and bridges throughout the river area, (near Alverstone IOW). The site measured approximately 1500m x 200m and due to budgetary constraints by the Environment Agency, had to be surveyed in one day, with the information drawn up the following day.

Maximising Productivity

Due to the size of the area and the level of information required in the allotted time, Leica Viva GS15 RTK GPS in conjunction with Leica Viva TS15 Total station were deployed to maximise productivity and provide accurate data which meets the standards of Environment Agency Specifications (Ordnance Survey bench marks are no longer maintained and the EA requires a minimum occupation using RTK GPS to obtain accurate height information relating to Ordnance Survey Datum). This was of utmost importance due to the nature of the work.

With waders at the ready, six 250m long river and flood plain sections were surveyed using the GPS. Where most of the river detail was under thick foliage the Total Station was deployed to survey 10 sluices, culverts and bridge details. (This was still tied into Ordnance Survey OSGB 36 Co-ordinates by resecting points measured by the GPS and TPS concurrently)

The data was duly processed and output as AutoCAD data in 2D and 3D. CSV files were also provided to enable the hydrologist to analyse the information without expensive AutoCAD software.

For further information please contact enquiry@mayerbrown.co.uk

River Yar equipment for development work

Related content


Request callback

Please leave us your details and we will endeavour to call you back as soon as we can.

Request callback

Keep in touch

Contact us for more information

Sign up to keep in touch

Visit our preference centre to sign up for our e-newsletter and update your preferences.

ROSPA
CQMS
Construction Line
Bloom
Mind
Woking Food Bank
bmtrada