Lancaster Town Centre PARAMICS Simulation Model

Project Section:

Modelling and GIS

Client:

Centros Miller (for Lancaster City Council)

Scheme Objectives:
Mayer Brown was commissioned by Centros Miller, Lancaster City Council’s chosen preferred developer, to assess the transport implications for the implementation of the Masterplan for a 10-acre Canal Corridor North Site in Lancaster city centre.

As part of the study, a PARAMICS model for the town centre, based on the Council’s earlier model, was developed by Mayer Brown to evaluate the design and management options.

Mayer Brown’s Role:

Mayer Brown Ltd’s brief was to further develop the County’s model by:

  • Carrying out traffic surveys
  • Updating the Council’s model to provide a base model
  • Evaluating development schemes and
  • Optimising signal settings using LINSIG and TRANSYT

Project Ref:

MOD-003

Issue Date:

1/8/2006

Project Author:

Dr Xu Zhang